Company Details
Unisite Group Ltd.
- Loading and unloading elements in the box construction, underwater, for transport ashore
Photo of our Anchor Box:
The construction is to be built according to the drawing with rules of good workmanship.
The box anchor consists of:
- a box anchor
- three anchoring pins with local reinforcement plates
- central anchoring pin with pulling eyes
- four reinforced openings
- one hosting eye of 200T
All fabricated steelwork used in the construction will be to manufacturing standard of normal or classification society.
All materials proposed will be selected to comply with the latest Health and Safety Rules.
Paint systems for hull protection will be of the highest quality (Hempel, Inter, Sigma, Jotun)
All welding will be performed in accordance with drawing and order and UniSite experience and all welding will be continuous and full penetration.
The workmanship have good marine practice. Care are taken to ensure fair lines, smooth surfaces and neat welding.
| MAIN PARTICULARS |
Tolerance | High accuracy(ISO2768, ISO5817, ISO13920) |
Material | Q345D or other materials |
Dimension(L*B*H) | As per drawing, as large as we can |
Weight | 19ton-22ton, total 220 |
Coating | Sa2.5 blasted and two or three layers painted with highest quality |
Marking | as per clients' requirements |
Inspection | material, construction, dimension, welding seam, non defective test, paint inspection |
Others | Recyclable, in line with environmental requirements and standards, and reliable |