Company Details
Unisite Group Ltd.
3.floating positioning device of the mooring system design, construction and maintenance of certification and inspection agencies should comply with the norms and standards and / or use norms and standards.
Photo of our Mooring System:
position mooring system
mooring system can be divided into: (1) multi point mooring system; (2) single point mooring system in various forms, the mooring system can be divided into: a) no thruster assisted mooring system; and b) thruster assisted mooring system. (3) dynamic positioning system
mooring cable
By the combination of strength of mooring cable, fiber cable, anchor or mooring cable and above. The mooring cable can also be provided with an elastic float and / or weight. When the elastic mooring buoy and / or weight, you should consider the effect of the acceleration and the possible resonance effect.
Pre tension
When the floating device is determined by the mean shift, the size of the pre tension is allowed to adjust the tension distribution of the Mooring Rope. 4.2.4 thruster assisted mooring system
Thruster assisted mooring system
floating device is provided with a thruster, all or part of the net thrust effect can be considered in all design conditions. The effect depends on the thruster control system and design conditions. The thruster can be manual control or automatic control.
Mooring design criteria
The 4.4.1 design of the mooring system should comply with the norms and standards of certification and inspection agencies and / or the specification and standard requirements:
(1) average deviation and the maximum offset; (2) mooring cable tension; (3) grip anchor system; (4) mooring cable fatigue life.